In A Hour.com

How To Frame A Wall

Articles
How To Videos
Follow
Kitchens
Bathrooms
Heating And Cooling
Doors And Windows
Interior Spaces
Electrical
Roofing
Kitchen And Bathroom
Floors
Door And Windows

Walls And Framing
Painting

Fences And Decks
Twitter
Facebook
Outdoors
Painting
Floors
Plumbing
Walls And Framing
DIY Projects
Heating And Cooling
Plumbing
Safety
Basement
Electrical
Other Projects
DIY In A Hour.com
© DIY In A Hour.com - Sitemap - Privacy PolicyAbout Us - Terms Of Use

What Next?

Videos      DIY Projects      Interior Spaces      All Spaces
In new construction, such as a room addition, framing is basically a textbook operation.  In remodeling an existing structure, however, you must be prepared to improvise and make adjustments for unique situations.

You may find unorthodox framing conditions inside a wall, under a floor, or in an attic, and you will have to work around them.  Your goal should always be to make the house stronger when you finish than it was when you began.

Framing Walls


Stud walls consist of a sole plate nailed to the subfloor, vertical studs, and a double top plate, with extra studs and blocking added where walls intersect.  Openings are framed with headers and extra studs.  The terminology for the parts discussed may vary in different parts of the country and carpenters and contractors may have their own vernacular but they all serve the same function.

Studs.  Studs are normally spaced every 16 inches or 24 inches, on center.  If the wall bears a floor, the studs must be spaced no more than every 16 inches on center.  Studs are usually 2 by 4s, but must be 2 by 6 if the wall bears more than two floors.  In cold climates, 2 by 6s are often used for exterior walls because they can hold more insulation.

The standard height of most ceilings is 8 feet, so the studs are typically 92 ¼ inches tall.  Higher ceiling require longer studs.  If you are ordering studs for a large project, figure one stud for every linear foot of wall.  The extras will get used up fast for blocking and cripple studs.  A good practice is to use standard framing lumber for most of the wall, but to use kiln-dried studs to frame doors and large windows to ensure that they will be absolutely straight.

Plates.  The soleplate and top plate are the same size lumber as the studs, usually 2 by 4s.  Use long lumber for plates, splicing lengths together for long walls.
Although the soleplate does not extend across doorways, if you are framing a wall on the floor and lifting it into position, it is easier to use a continuous soleplate and then cut out the doorway section after the wall is in place.

If you are building walls on a concrete slab, use pressure-treated lumber or a durable species of wood for the soleplates.

Bearing walls require a double top plate, consisting of a top plate and a cap plate nailed onto it.
Living Room
Modern Living Room
A single top plate is allowed on partition walls.  However, if you are framing many walls at a time, you can avoid confusion and having to cut studs to different lengths if you frame all the walls with double top plates.

When framing a wall, first attach only the top plate.  Install the cap plate after all the walls are up.  This makes it possible to overlap the top plate and cap plate at the corners, making a stronger connection.  Any splice in a top plate must be centered over a stud, and splices in cap plates must be at least 4 feet from splices in top plates.

Openings.  Frame openings with a header across the top.  The header should be the same width as the studs, either solid 4-by lumber or two pieces of 2-by material sandwiched together with 3/8-inch plywood spacers between them.

The depth of the header depends on its span and the loads concentrated above it.  For instance, you can use a 4 by 6 header to span 6 feet if the wall has no floors above it, but this same header can only span 4 feet if it is carrying another floor as well as the roof load.

Each end of the header bears on a shorter stud called a trimmer stud or jack stud, which must extend all the way to the soleplate.  Trimmer studs are flanked by full-length studs, sometimes called king studs.  Regardless of where an opening occurs, the 16-inch layout of joists continues from one end of the wall to the other.  Cripple studs, used to fill in spaces above headers and below sills, should follow this layout.

Comments?
Advertisement
Related Articles
Adding Space and Framing Floors
A Quick Overview About Walls
Recognizing Bearing Walls
Related Videos
Video: Opening Up A Load-Bearing Wall
Video: Taping And Mudding Drywall
Video: Repairing Plaster Cracks
Wall Framing

Laying Out A Wall


Construct the longest walls first.  Begin by marking stud locations on the soleplate and top plate.  To ensure the layout starts from the same end, mark both plates at the same time.  Because the first measurement starts at the corner of the wall rather than the center of a stud, it should be 15 ¼ inches; the rest are 16 inches apart. 

One trick for making this measurement less confusing is to tack a scrap of ¾-inch-thick wood onto the end of the plates and hook the tape measure over it.  This makes the first 16-inch mark automatically 15 ¼ inches from the end of the plates.

Building a wall.  Construct new walls by building them on the floor and raising them into place.  Build the corner posts first, using two studs and short blocking.  Frame each opening with a header, trimmer studs, king studs, and sill, if needed.  Lay these assemblies in place, along with all the field joists, between the soleplate and top plate, aligning them with the layout marks.

Then facenail each plate into all the studs with two 16d common nails at each end.  Finally, cut and install the cripple studs, toenailing each one into the header with four 8d nails.

Raising the walls.  Before lifting a wall, snap a chalk line onto the floor for aligning the soleplate.  Then lift the wall into place.  Nail the soleplate into the floor at every joist (every 16 inches).  Using a plumb bob, plumb stick, or long level, align the wall so that it is plumb in both directions.  Brace it temporarily with 2 by 4s.

Leave the temporary bracing in place until you are ready to install permanent bracing.  Most codes allow 3 types: metal straps, 1-by boards that are notched into the exterior face of the wall frame, and solid sheathing panels.  Plywood sheathing is the best type, because it can withstand tremendous wind or earthquake forces if it is nailed properly with as few seams as possible.

Miscellaneous Articles

Removing A Bathtub
Working With Metal
Choose A Good Bathroom Layout
Replacing a bathtub or installing a new one is a major project that usually involves some framing, rough plumbing...
Metal is used in a number of building materials, such as flashing and framing connectors.  Windows, doors, and many...
A successful bathroom design is one that reflects the lifestyle of its users.  Adults with identical schedules...
read more
read more
read more